Project Cost Control

Know where the project really stands — before month end.

Foras connects your budget, captured project cost and Finance actuals into a current cost position you can explain — without hiding the differences that still need a decision.

For commercial and project teams responsible for controlling cost while the work is still moving.

Northgate Logistics Park — Phase 2

Cost position · Aug 2026 · Demo data

Approved Budget

£18.42m

Captured

£11.85m

Finance

£10.47m

Adjusted CTD

£11.96m

Illustrative cost position by cost code, comparing captured project cost with Finance actuals and the current position decision. Difference = Captured − Finance.
Cost codeDiffDecision
210Labour£262kDecision needed
311Shoring & Formwork−£115kMatch Finance
707Subcontract£158kNeeds review
3 of 26 cost codes shownActual Foras interface pattern · Illustrative demo data

The project total is only useful if you can explain what sits behind it.

Site cost exists before it reaches Finance

Labour, plant and subcontract progress happen weeks before a commercial document is processed. The project view has to see them; the ledger cannot yet.

Posting periods and project cut-off rarely align

A cost incurred on the 28th may post in the following period. The difference is real, legitimate and temporary — but only if someone knows that is what it is.

The total can reconcile while packages are wrong

Two cost codes offsetting each other produce a project total that looks correct and a package position that is misleading.

Manual adjustment destroys the reason

A spreadsheet plug makes the numbers agree and removes the one thing worth keeping: why they differed in the first place.

The goal is not to force one number. It is to know which number means what, and why the gap exists.

How it works

One controlled position, built from separate truths.

  1. 01

    Baseline budget

    The approved control baseline for the project, with change managed explicitly rather than edited in place.

  2. 02

    Captured project cost

    Site and commercial evidence recorded against the work and budget line it belongs to.

  3. 03

    Finance actuals

    Posted accounting actuals stay visible and authoritative. Foras does not overwrite them.

  4. 04

    Reconciliation decisions

    Timing, allocation or correction differences are explained and recorded against the cost code.

  5. 05

    Adjusted cost to date

    The controlled to-date position used for project decisions — and the starting point for forecast.

→ Adjusted cost to date then becomes the input to forecast final cost.

Product

See Captured and Finance side by side.

If the numbers differ, the difference should be visible — not buried in a spreadsheet plug.

Northgate Logistics Park — Phase 2

Position · Aug 2026 · Demo data

Captured

£11.85m

Finance

£10.47m

Adjusted CTD

£11.97m

Illustrative Finance position by cost code, comparing captured project cost with Finance actuals, the difference, reconciliation adjustments, adjusted cost to date and the current position decision.
Cost codeDiffCTDDecision
150Project Management£60k£1.84mTiming
210Labour£262k£2.96mDecision needed
311Shoring−£115k£1.54mMatch Finance
707Subcontract£158k£3.18mNeeds review

Difference = Captured − Finance. A negative difference means captured cost sits below Finance. Shoring shows a Match Finance adjustment of +£115,000, so adjusted CTD equals the Finance position to date. Values rounded for display.

4 of 26 cost-code positions shownActual Foras interface pattern · Illustrative demo data

A monthly reconciliation that holds

  • Review the cumulative position by cost code or work area, not only the current month.
  • Identify differences material enough to need a decision.
  • Record the reason and the decision rather than changing the source actual.
  • Carry genuine timing differences forward until Finance catches up.
  • Keep the explanation available for the next review.

Differences are surfaced for review — they are not automatically classified or resolved. The judgement stays with the commercial team, and the reasoning is kept.

Control the package, not just the project total.

A project-level number can look right while cost sits against the wrong work area or budget line. Foras controls cost at budget-line and cost-classification level, with WBS where the project uses it.

Where one cost code carries more than one budget line, capture selects the line the work draws down. A £5,000 captured cost against 311 Shoring & Formwork is charged to the line it belongs to — not silently split £2,500 / £2,500. Finance imports remain at cost-code level, so the two views still reconcile.

The detail stays commercially meaningful, so the forecast starts from a position you can trust.

311Shoring & Formwork

Shared cost code — choose budget line

Illustrative budget lines within one cost code, showing approved budget, captured cost to date and remaining budget.
Budget lineBudgetCTDRemaining
311.1 Piling & shoringSelected£640,000£412,500£227,500
311.2 Formwork & falsework£385,000£196,800£188,200
Captured cost £5,000 → 311.1Drawn down against the selected line, not split across both
Actual Foras interface pattern · Illustrative demo data

A baseline should not move silently.

Cost control depends on a stable point of comparison. Foras applies project-control governance to the budget baseline — not accounting controls, and not a lock nobody can work with.

Locked baseline

The approved budget is held as the control baseline and is not editable in passing.

Explicit revision

An unlock requires a recorded reason and author. The UI then reminds the user to re-lock, so the revision stays explicit and auditable.

Variations path

Routine scope change flows through variations into approved budget — history is not rewritten.

Drift disclosed

Where a forecast is working from a stale or incomplete approved budget, that is stated on screen with one clear Refresh from Budget action.

Next step

A reliable forecast starts with a reliable cost position.

Once the to-date position is explainable, the remaining-cost forecast has a defensible starting point.

Northgate Logistics Park — Phase 2

Forecast · Aug 2026 · Demo data

Approved Budget

£18,420,000

Original Budget + Approved Variations

Adj CTD

£11,964,300

Raw CTD + Adjustments

Forecast CTC

£6,941,100

Qty × Rate × Util%

Forecast Final Cost

£18,905,400

Adj CTD + CTC

Forecast Variance

£485,400 over

2.6% over Approved Budget

Actual Foras interface pattern · Illustrative demo data

One cost position. Different decisions.

Commercial Manager

Where are we financially, why has it moved, and what needs action this week?

Project Manager

Which work areas are creating cost pressure, and what has actually happened on site?

Quantity Surveyor

Which budget and change lines are being consumed, and where is the commercial exposure?

Project Director

Can the team explain the current position and emerging pressure without rebuilding the report?

Related guide

Why your construction project cost position doesn’t match Finance

A project cost position rarely matches Finance actuals to the penny — and it shouldn’t. The commercial risk sits in the part of the difference nobody can explain.

Read the guide →

See how your current project position would look in Foras.

Bring the way you currently budget, capture cost and reconcile Finance. We’ll show how Foras would structure the position and where the differences become visible.