Finance Reconciliation

Site and Finance may differ — but you should know exactly why.

Foras keeps captured project cost and Finance actuals visible side by side, shows the cumulative difference, and records the commercial decision used to explain or settle it.

Finance remains authoritative for posted actuals. Foras makes the project-control difference explainable.

Northgate Logistics Park — Phase 2

Position · Aug 2026 · Demo data

Captured

£11.85m

Finance

£10.47m

Adjusted CTD

£11.97m

Illustrative Finance position by cost code, comparing captured project cost with Finance actuals, the difference, reconciliation adjustments, adjusted cost to date and the current position decision.
Cost codeDiffCTDDecision
150Project Management£60k£1.84mTiming
210Labour£262k£2.96mDecision needed
311Shoring−£115k£1.54mMatch Finance
707Subcontract£158k£3.18mNeeds review

Difference = Captured − Finance. A negative difference means captured cost sits below Finance. Shoring shows a Match Finance adjustment of +£115,000, so adjusted CTD equals the Finance position to date. Values rounded for display.

4 of 26 cost-code positions shownActual Foras interface pattern · Illustrative demo data

Two legitimate views

The difference is normal. An unexplained difference is the problem.

Finance actuals

What has been posted into the accounting ledger and period. Authoritative for posted actuals, and the figure the business reports on.

Project position

What the project team has captured — labour, plant, supply and subcontract activity — and needs in order to control the job commercially, before everything is posted.

Timing
Work is done and captured on site before the supplier invoice or internal cost is posted.
Cut-off
The project week and the Finance period do not end on the same day.
Allocation
Finance posts to a different cost code, or to none, until the coding is agreed.
Late cost
Invoices, credits and internal recharges arrive after the project already reported the position.
Corrections
Reclassifications and journal corrections move cost after the original posting.

Reconciliation should preserve both views and explain the gap — not overwrite one with the other.

Period attribution

Reconcile cost in the period Finance actually posted it.

Foras derives the reconciliation period for each Finance transaction using a clear priority order, and shows which source field determined it.

  1. 1

    Accounting period

    Used whenever your ERP supplies it. Not every system does.

  2. 2

    Finance posting date

    Used when no accounting period is provided with the transaction.

  3. 3

    Transaction date

    The final fallback when neither of the above is available.

Illustrative transaction
Finance posting date
30 Jun 2026
Transaction date
2 Jul 2026
Reconciles in
June 2026 — Finance posted it in June

If an accounting period is supplied, it takes priority over the posting date. Raw source dates stay visible — Foras derives the reconciliation period without rewriting them.

The Position

One position shows where Site and Finance differ.

Review the cumulative cost position at the level where a commercial decision can actually be made.

Northgate Logistics Park — Phase 2

Position · Aug 2026 · Demo data

Captured

£11.85m

Finance

£10.47m

Adjusted CTD

£11.97m

Illustrative Finance position by cost code, comparing captured project cost with Finance actuals, the difference, reconciliation adjustments, adjusted cost to date and the current position decision.
Cost codeCapturedFinanceDifferenceAdjustmentsAdjusted CTDDecision
150Project Management£1.84m£1.78m£60k£1.84mTiming
210Labour£2.96m£2.70m£262k£2.96mDecision needed
311Shoring£1.43m£1.54m−£115k+£115k£1.54mMatch Finance
707Subcontract£3.18m£3.02m£158k£3.18mNeeds review

Difference = Captured − Finance. A negative difference means captured cost sits below Finance. Shoring shows a Match Finance adjustment of +£115,000, so adjusted CTD equals the Finance position to date. Values rounded for display.

4 of 26 cost-code positions shownActual Foras interface pattern · Illustrative demo data
Captured
Project cost recorded through site and commercial capture.
Finance
Actuals posted in Finance for the canonical reconciliation period.
Difference
Captured − Finance. Negative means captured cost sits below Finance.
Adjustments
Reconciliation entries recorded by a decision, shown separately.
Adjusted CTD
Captured cost plus recorded adjustments — the position you control to.

Each figure is supported by the underlying records behind it: Foras provides read-only evidence of the captured cost and Finance transactions that make up a position, so a number can be explained rather than argued about.

Position decisions

Decide what the difference means — not how to hide it.

How Timing and Match Finance decisions work in Foras.
DecisionWhat it meansFinancial effectResulting position
TimingThe difference is expected timing. Nothing needs settling yet.No adjustment is posted.Adjusted CTD stays at the captured (or previously adjusted) position.
Match FinanceFinance is authoritative to date for this position.One adjustment is posted, equal to Finance TD − Captured TD.Adjusted CTD matches the Finance position to date.

Decisions are stored with a basis

A decision records the position it was made against. If captured cost or Finance moves afterwards, the row becomes Needs review — the earlier decision is never silently applied to new figures. Positions that already match Finance need no further decision.

Worked example · 311 Shoring · Illustrative demo data
Captured TD
£1,426,700
Finance TD
£1,541,700
Difference (Captured − Finance)
−£115,000
Match Finance adjustment
+£115,000
Adjusted CTD
£1,541,700

Safeguards

Not every difference should be matched.

Configured accrual cost codeAccrual · Timing only
Accrual codes stay visible in Finance actuals but are excluded from the Match Finance adjustment basis, so they remain Timing only. Which codes behave this way is financial policy you configure, not something Foras decides.
Unclassified costDecision unavailable
Cost that has not been classified to a position cannot be decided yet. Classify it first, then the decision becomes available.
Position already matches FinanceNo decision required
Where captured cost and Finance already agree to date, no decision is required and none is requested.

Where an action is unavailable, Foras states the reason rather than leaving a dead-end status on the row.

Work breakdown

On WBS projects, reconcile the position at WBS + Cost Item.

WBS is optional and set per project. Where it is used, the same cost code can represent genuinely different commercial positions in different areas of the works.

  • The parent cost code gives orientation. Where it splits across more than one WBS element, each leaf is decided independently.
  • Unassigned WBS stays visible as its own position rather than being guessed or spread across areas.
  • Match Finance requires Finance to be attributed to that WBS leaf. Until it is, Timing remains available and the reason the Match Finance adjustment is unavailable is shown on the row.
  • Accrual positions remain Timing only at leaf level too.

Cost code 311 — Shoring

Position by WBS · Aug 2026 · Demo data

Parent cost code · Captured £1,426,700 · Finance £1,541,700 · orientation only, decisions are made on each leaf below.

Illustrative position for one cost code split across WBS elements, with captured cost, Finance actuals, difference and the decision available on each leaf.
WBS element + Cost ItemCapturedFinanceDifferenceDecision
02.10 Retaining Walls£812,400£927,400−£115,000Match Finance
03.20 Bridge Abutments£498,300£471,900£26,400Timing
Unassigned WBSFinance must be attributed to a WBS before Match Finance can be used.£116,000£142,400−£26,400Timing
Actual Foras interface pattern · Illustrative demo data

Period close

Close the period from the same Position you reviewed.

Close readiness is measured against the same position rows the commercial team worked on — not a separate hidden checklist.

Close review — Aug 2026Demo data
Timing
8 positions
Match Finance
5 positions
Decision needed
1 blocker
Position changed
1 blocker
Timing difference remaining open
£322,800

Informational. A legitimate Timing decision can leave a difference open — Foras does not pretend it has disappeared.

An undecided position, or one flagged Needs review because its basis moved, is outstanding work and is listed as a blocker.

Closing and locking a reconciliation period is project reconciliation-period control. It is not an accounting close, and it does not post anything into your ledger.

Late postings

If Finance changes a locked period later, the cost does not disappear.

June is locked. A July import contains a Finance transaction whose canonical period is June. Foras surfaces it as a late posting for review rather than absorbing it silently or reclassifying it automatically.

Reopen June

The period is reopened with a recorded reason, the transaction reconciles in the period Finance posted it, and affected positions return for review.

Recognise in the current period

June stays locked and the cost is recognised in the current open period, with the reason recorded so the treatment can be explained later.

Both routes require a reason and remain visible afterwards. Source accounting, posting and transaction dates are never rewritten.

Audit

The audit should explain the commercial decision.

Not just that a record changed — what was decided, on what basis, by whom, and what financial effect followed.

Position decision history

Aug 2026 · Demo data

  • 311 Shoring · WBS 02.10 Retaining Walls

    Match Finance
    Captured TD
    £812,400
    Finance TD
    £927,400
    Difference TD
    −£115,000
    Adjustment
    +£115,000
    Adjusted CTD
    £927,400

    Decided by Commercial Manager · 28 Aug 2026

  • 150 Project Management

    Timing
    Captured TD
    £1,842,300
    Finance TD
    £1,781,900
    Difference TD
    £60,400
    Adjustment
    No adjustment
    Adjusted CTD
    £1,842,300

    Decided by Commercial Manager · 28 Aug 2026

Superseded decisions remain in history rather than being removed. Actual Foras interface pattern · Illustrative demo data

A Timing decision reads as no adjustment, not a £0 entry pretending to be a settlement. Where a decision is later superseded, the previous decision stays in history.

Related guide

Why your construction project cost position doesn’t match Finance

A project cost position rarely matches Finance actuals to the penny — and it shouldn’t. The commercial risk sits in the part of the difference nobody can explain.

Read the guide →

Bring your month-end cost position. We’ll show you where the differences become explainable.

Use the way you currently compare project cost with Finance. We’ll map the same position into Foras and show how timing, Match Finance adjustment and review decisions are recorded.