Construction project controls that connect site, cost, Finance and forecast.

Foras turns site activity into a commercially useful position: what the project has cost, what Finance says, where the differences come from, and where the project is likely to finish.

Northgate Logistics Park — Phase 2

Position · Aug 2026 · Demo data

Captured

£11.85m

Finance

£10.47m

Adjusted CTD

£11.97m

Illustrative Finance position by cost code, comparing captured project cost with Finance actuals, the difference, reconciliation adjustments, adjusted cost to date and the current position decision.
Cost codeDiffCTDDecision
150Project Management£60k£1.84mTiming
210Labour£262k£2.96m
311Shoring−£115k£1.54mMatch Finance
707Subcontract£158k£3.18m

Difference = Captured − Finance. A negative difference means captured cost sits below Finance. Shoring shows a Match Finance adjustment of +£115,000, so adjusted CTD equals the Finance position to date. Values rounded for display.

4 of 26 cost-code positions shownActual Foras interface pattern · Illustrative demo data

Site → cost

Capture what happened on site and classify it to the project structure

Site teams record labour, plant, materials, subcontract activity and variations in the Site Diary. Each entry carries the date the work occurred, the cost item it belongs to, and supporting evidence such as notes and photos.

Cost is classified against the project budget structure you use — cost codes, and WBS elements or Work Items where the project is set up that way. Management costs, materials, subcontractors, plant and labour all flow into the same captured position.

Cost that has not yet been attributed to a cost item stays visible for investigation rather than being silently excluded or guessed.

Site Diary — 28 Aug 2026

Northgate Logistics Park — Phase 2 · Demo data

  1. People
  2. Plant
  3. Progress
  4. Vars
  5. Allocate
  6. Subcontractor Activity
  7. Materials
  8. Notes
Illustrative People step of a Site Diary day, showing each person’s role, resulting cost classification and hours recorded.
PersonCost ItemHours
A. HughesGeneral Operative211 Labour9.5 h
J. ReidPlant Operator211 Labour10 h
T. MorganNo role — needs attentionUnassigned8 h
Actual Foras interface pattern · Illustrative demo data · Cost stays unassigned until the person’s Role is set on their personnel record.

Cost Capture — Aug 2026

Northgate Logistics Park — Phase 2 · Demo data

Site Captured

£131,260

Labour

£42,860

Plant

£18,400

Unassigned

£6,250

Illustrative captured cost by cost item, including an Unassigned bucket that needs classification.
Cost ItemCapturedStatus
211Labour£42,860
310Plant£18,400
520Materials£27,750
707Subcontract£36,000
Unassigned£6,250Needs classification

Unassigned · source records

  • 28 Aug 2026 · People · T. Morgan£2,480Open diary
  • 27 Aug 2026 · Plant · 13t excavator£1,320Open diary
Actual Foras interface pattern · Illustrative demo data · Diary-sourced rows can open the exact diary day and step. Records from commercial registers are traced to the register entry instead.

Northgate Logistics Park — Phase 2

Cost position · Aug 2026 · Demo data

Approved Budget

£18.42m

Captured

£11.85m

Finance

£10.47m

Adjusted CTD

£11.96m

Illustrative cost position by cost code, comparing captured project cost with Finance actuals and the current position decision. Difference = Captured − Finance.
Cost codeDiffDecision
210Labour£262k
311Shoring & Formwork−£115kMatch Finance
707Subcontract£158k
3 of 26 cost codes shownActual Foras interface pattern · Illustrative demo data

Cost → Finance

Compare captured cost with Finance actuals and settle the difference

The Position view puts captured project cost next to Finance actuals for each cost code. The difference is visible immediately, not buried in a month-end total.

You record what the difference means — for example Timing, where the gap is expected to wash out, or Match Finance, where Finance is authoritative to date and an adjustment brings adjusted CTD into line.

Each decision carries the author and reason, and superseded decisions remain in history so the position can be explained later.

Position → forecast

Build the forecast from adjusted CTD and cost to complete

Forecast final cost is adjusted cost to date plus cost to complete. Cost to complete is priced line by line as quantity × rate × utilisation, so the forecast is built from explicit commercial assumptions rather than trend or guesswork.

Approved variations feed into the approved budget, and the forecast variance shows whether the project is tracking over or under that budget. Variation evidence and provenance stay attached to the cost that relates to them, so a change can be explained without altering how budget, cost to date or forecast are calculated. When the budget or forecast-line assumptions move, the change is visible and can be frozen for reporting.

Northgate Logistics Park — Phase 2

Forecast · Aug 2026 · Demo data

Approved Budget

£18,420,000

Original Budget + Approved Variations

Adj CTD

£11,964,300

Raw CTD + Adjustments

Forecast CTC

£6,941,100

Qty × Rate × Util%

Forecast Final Cost

£18,905,400

Adj CTD + CTC

Forecast Variance

£485,400 over

2.6% over Approved Budget

Actual Foras interface pattern · Illustrative demo data
Actual Foras interface pattern · Illustrative demo data

Northgate Logistics Park — Phase 2 · Demo data

V-012 · Additional retaining-wall drainage

Raised from a Site Diary note · recorded in the Vars step

Site Diary days on which variation V-012 was worked, with the captured cost of each day. Illustrative demo data.
Day workedRecorded in VarsCaptured cost
Tue 11 AugVars — 2 operatives, 7.5 hrs · 1 excavator, 4 hrs£1,148
Wed 12 AugVars — 2 operatives, 9.0 hrs · materials from register£1,462
Thu 13 AugVars — 1 operative, 4.5 hrs · note & photos attached£514
Captured to dateLabour, plant and materials at project rates£3,124

Once agreed, an Approved Variation increases Approved Budget — and its captured cost is already in the position. Open a day to see the diary record behind a line.

Explainability

Trace every decision back to its source

Commercial judgement is only useful if it can be explained. Foras keeps the decision history behind each position: who recorded it, when, and why.

Cost captured from the Site Diary carries its classification, evidence and occurrence date with it, so the detail behind a number stays connected. Superseded decisions are retained, not overwritten, so month-end positions can be reconciled against what was reported at the time.

Position decision history

Aug 2026 · Demo data

  • 311 Shoring · WBS 02.10 Retaining Walls

    Match Finance
    Captured TD
    £812,400
    Finance TD
    £927,400
    Difference TD
    −£115,000
    Adjustment
    +£115,000
    Adjusted CTD
    £927,400

    Decided by Commercial Manager · 28 Aug 2026

  • 150 Project Management

    Timing
    Captured TD
    £1,842,300
    Finance TD
    £1,781,900
    Difference TD
    £60,400
    Adjustment
    No adjustment
    Adjusted CTD
    £1,842,300

    Decided by Commercial Manager · 28 Aug 2026

Superseded decisions remain in history rather than being removed. Actual Foras interface pattern · Illustrative demo data

How Foras fits

Built to work with Finance, not replace it

Finance stays authoritative

COINS and your ERP remain the system of record for posted actuals. Foras imports them for reconciliation and records the project decision — it does not post back.

Your structure, your choice

WBS elements and Work Items are optional and configured per project. Foras works with the breakdown structure you actually run.

No predictive promises

Forecasting is explicit arithmetic on quantities, rates and utilisation. Foras does not claim to predict the future — it makes your commercial assumptions visible and checkable.

Demo data is clearly marked

Product screenshots and previews on this site use illustrative demo data. They show the interface pattern, not a live customer project.

We market current capability, not roadmap

Our standard is that anything presented here describes how Foras works today. Planned capability is not shown as available, and wording is corrected as the product changes.

Import and reconcile

The COINS integration is an import/reconciliation workflow. It is not a real-time integration and does not automatically keep both systems in sync.

Who it is for

Built for the people who own the project position

Commercial Managers use Foras to explain the gap between Site and Finance, settle the position and protect forecast margin. Project Managers use it to turn site activity into cost information the commercial team can act on.