For Site Managers & Engineers

Record the day once. Let it do the work everywhere else.

Labour, plant, materials and subcontract activity go into the diary you keep anyway. Foras turns that record into dated, classified cost the commercial team can actually use — so you are not filling in the same day twice.

Site Diary — 28 Aug 2026

Northgate Logistics Park — Phase 2 · Demo data

  1. People
  2. Plant
  3. Progress
  4. Vars
  5. Allocate
  6. Subcontractor Activity
  7. Materials
  8. Notes
Illustrative People step of a Site Diary day, showing each person’s role, resulting cost classification and hours recorded.
PersonCost ItemHours
A. HughesGeneral Operative211 Labour9.5 h
J. ReidPlant Operator211 Labour10 h
T. MorganNo role — needs attentionUnassigned8 h
Actual Foras interface pattern · Illustrative demo data · Cost stays unassigned until the person’s Role is set on their personnel record.

The daily reality

Recording is easy. Recording it three times is not.

The site already knows what happened. The problem is how many places that knowledge has to be re-entered before anyone downstream can use it.

01

The same day is written down three times

Once in the diary, once in an allocation sheet, once in whatever the commercial team asks for. None of them quite matches the others.

02

Nobody sees what you recorded

The diary is kept diligently and then read by almost no one, because it is not in a form the commercial or Finance side can use.

03

Extra work starts before the paperwork does

A verbal instruction moves the job forward. The record of who was there, what plant ran and what was used gets written later, if at all.

04

You get asked about numbers weeks later

Questions arrive about a week you can barely remember, and answering them means reconstructing it from memory and photographs.

How Foras helps

A diary that counts for something

One record, kept as you already do

Labour, plant, materials and subcontract activity are recorded in the diary. The same entry becomes the captured cost the commercial team works from.

Dated to the day the work happened

Entries carry the occurrence date, not the date they were typed up, so cost lands in the right week and the right comparison against Finance.

Classified while you are there

Each entry is classified to a cost code at capture, and to a WBS element or Work Item where the project uses them. Both are optional and set per project.

Variation work captured with evidence

Work done under a variation can be recorded against it as it happens, with the hours, plant and materials attached rather than recalled later.

Nothing is lost if the coding is unclear

Cost that cannot yet be attributed stays in cost to date and is surfaced for review. It does not vanish, and it does not stop you recording the day.

What capture looks like

Hours, plant and materials against the day they happened

Classified to a cost code as they are recorded, with WBS elements or Work Items selected here where the project uses them.

Cost Capture — Aug 2026

Northgate Logistics Park — Phase 2 · Demo data

Site Captured

£131,260

Labour

£42,860

Plant

£18,400

Unassigned

£6,250

Illustrative captured cost by cost item, including an Unassigned bucket that needs classification.
Cost ItemCapturedStatus
211Labour£42,860
310Plant£18,400
520Materials£27,750
707Subcontract£36,000
Unassigned£6,250Needs classification

Unassigned · source records

  • 28 Aug 2026 · People · T. Morgan£2,480Open diary
  • 27 Aug 2026 · Plant · 13t excavator£1,320Open diary
Actual Foras interface pattern · Illustrative demo data · Diary-sourced rows can open the exact diary day and step. Records from commercial registers are traced to the register entry instead.

Actual Foras interface pattern. Entries are illustrative demo data from the Northgate Logistics Park demo project.

What changes in practice

Four steps, once a day

  1. 01

    Record the day

    People, plant, materials and subcontract activity go in against the day they happened, in the diary the site keeps anyway.

  2. 02

    Classify at the point of entry

    Pick the cost code — and WBS element or Work Item if the project uses them — while the detail is still fresh.

  3. 03

    Attach the evidence

    Where the work sits under a variation, the record carries the supporting detail from the start.

  4. 04

    Stop re-keying

    The commercial team reads the same record. There is no separate return to fill in for them.

What you get

Less admin, more weight behind your record

One entry, not three

The record you keep for the site is the record the business uses.

Your work is visible

Effort recorded on site shows up in the project cost position instead of stopping at the site office.

Better answers, faster

Questions about a past week are answered from the record, not from memory.

Stronger variation position

The cost of extra work is captured while it happens, which is when it is easiest to evidence.

Bring a week from your site. We’ll show what it becomes.

Use your own diary entries — labour, plant, materials, a variation that started on a verbal. We’ll show how they land as commercial information.